Acumatica CAD PDM PLM Integration by Agni Link

AGNI LINK FOR
ACUMATICA

SEE IT IN ACTION!

Acumatica is a cloud-based ERP solution designed for medium-sized companies that want to have a business solution that adapts to their needs, but also to the market’s evolution.

Why choose Agni Link for Acumatica?

Acumatica easily adapts to all existing manufacturing systems (make-to-stock, make-to-order, engineer-to-order, configure-to-order, etc.) and can quickly become the primary source of information for your business.

Acumatica and Agni Link, when used together, can help to get a single source of truth by automating the transfer of Bills of Materials between the ERP and CAD/PDM/PLM applications made by Autodesk (AutoCAD, Autodesk Inventor, Autodesk Vault), SOLIDWORKS, PTC (Creo, Windchill) and Siemens (Solid Edge, Teamcenter), just to name a few.

Combined with Agni Link, Acumatica brings the ultimate integration of engineering and manufacturing data. But don’t just take our word for it, and request a free demo today!

Interested in a demo?

"*" indicates required fields

YYYY slash MM slash DD
Please indicate the timezone from where you will attend the demo
Name*
(Including country code and extension, if required)
Time Slot - First Choice
:
Time Slot - Second Choice
:
Time Slot - Third Choice
:

blank

Mario Nadeau
Technical Director, Law Marot-Milpro

blankblankblankblankblank

Agni Link allows us to cut our design and engineering costs by 20% by eliminating the need to manually copy BoM data from CAD to ERP

blank

Dean I. Haase
Software/Electrical Engineering Manager, Innovative Laser Technologies

blankblankblankblankblank

Agni Link helps us reduce our annual design and engineering costs by at least $90,000

blank

John Walsh
IT/Controls Manager, InterClean Equipment, Inc.

blankblankblankblankblank

InterClean Equipment saved 12% on design and engineering costs by moving to Agni Link! Not bad at all, I say 🙂

Metco Industrial Uses Agni Link To Integrate Microsoft Dynamics NAV and Autodesk Inventor

Tony Bates
Workshop Manager & Engineering, METCO Industrial Pty Ltd

blankblankblankblankblank

… Up to 10% of my time will be saved…

Western Trailers Logo

Dan Nursall

IT Manager, Western Trailers

blankblankblankblankblank

Agni Link has driven some “best practices” where our engineering department has made some very beneficial changes that have helped us overall

The Agni Link Benefits

blank

Reduce Design Time by up to 25%

In ETO-intensive manufacturing, anywhere between 5% and 25% of the total engineering is devoted to the transfer of Bills of Materials from engineering to manufacturing. Automating that process translates into dramatic savings… and improved lead time.

blank

Elimination of Costly Errors on Factory Floor

Increased BoM accuracy brings increased product quality, better yield on raw materials… and lower production costs.

 

blank

Rapid ROI

Agni Link usually pays for itself very quickly. Recovery periods of 180 days or less are not uncommon.

 

 

blank

Guaranteed on-Budget Implementation

With Elmo Solutions’ fixed fee programs, configuration and deployment are done for a fixed fee, no matter how complex your requirements are. Guaranteed cost… Guaranteed peace of mind!

 

blank

Automatic Error Detection and Correction

Agni Link’s unique architecture allows automatic resolution of discrepancies, based on rules over which the customer has complete control. Another way we can maximize engineering time.

 

 

blank

No Programming. Ever.

An Agni Link customer has full control over the integration process, thanks to the Agni Link Integration Builder. Add as many mappings as you like, modify or suppress existing mappings. Define data validity by your own rules. Without any programming whatsoever.

 

 

 

blank

Value-Added Services

The JumpStart (implementation support) and BigBangBoMs (Data Initialization) Programs greatly enhance the value of the solution by bringing complementary services… for a fixed fee. No surprises!

 

blank

Up And Running in 30 Days… or Less.

From the kick-off meeting to the final rollout, a typical implementation is normally completed within 20 business days.

 

 

 

blank

Multilingual

Agni Link currently works in English and French. Configuring other languages is a straightforward process, and can be easily done upon request.

Book a Free Demo Now!

"*" indicates required fields

YYYY slash MM slash DD
Please indicate the timezone from where you will attend the demo
Name*
(Including country code and extension, if required)
Time Slot - First Choice
:
Time Slot - Second Choice
:
Time Slot - Third Choice
:

Privacy Preference Center