WE HELP MANUFACTURERS DESIGN FASTER… AND MANUFACTURE BETTER

Automating the transfer of Bills of Materials and other product data to your ERP system will help improve engineering throughput by up to 25% and reduce dramatically costly errors on the factory floor while increasing product quality.

ENGINEERED-TO-ORDER (ETO) MANUFACTURER?
this solution is for you

YOU ARE A PARTNER AND NEED THIS SOLUTION
FOR A CLIENT ?

TRANSFER BOMS TO YOUR ERP FASTER

Transfer BoMs and items to manufacturing 900 times faster than your competitor!

This video shows how Agni Link can accomplish a task that normally takes about 2 hours… in 8 seconds!

Why choose us for the transfer of

your bills of materials to your ERP system?

DESIGN UP TO
25% FASTER

MANUFACTURE
FOR LESS

UP AND RUNNING
IN 30 DAYS

FIXED-FEE
IMPLEMENTATION
NO SURPRISES!

YOU’RE IN CONTROL…
WITHOUT
PROGRAMMING

IMPROVING ENGINEERING THROUGHPUT BY UP TO 25%

It is proven that in an ETO process, manual transcription of data from Engineering to Manufacturing can consume up to 25% of the total engineering effort. And unfortunately, the export-import approach is barely better. Only bidirectional, real-time data validation and populating can eliminate the terrible waste of brains assigned to tedious, improductive tasks. That usually comes with a substantial ROI… Recovery periods of 6 months or less are not uncommon.

QUICK RETURN ON INVESTMENT

Based on our experience, you should expect a fairly quick ROI since a typical Agni Link implementation pays for itself in 3-6 months in ETO-intensive environments, virtually eliminating manual and/or erratic transfer of data. Moreover, you can expect a reduction of your engineering cycle time of 5-20%, as a result of the reduction of the time spent on the transfer of BoMs.

However, the bulk of the ROI rather comes from savings resulting from a dramatic improvement in BoM accuracy. This, in turn, usually brings a substantial reduction of costly errors on the factory floor.

ELIMINATING COSTLY ERRORS ON THE FACTORY FLOOR

Agni Link’s unique approach improves Bill of Materials accuracy, which in turn brings a dramatic reduction of rework and scrapped materials on the shop floor, improving the quality of the product while slashing production costs.

UP AND RUNNING IN 30 DAYS… AND NO SURPRISES!

Our proven implementation process is very straightforward. Actually, most of our implementations can be done in 30 days, and for a fixed fee. On time… on budget… no surprises!

FULL CONTROL… AND NO PROGRAMMING NEEDED!

The whole integration process is driven by the Agni Link Integration file, which provides a comprehensive description of the mappings, as well as the properties and behaviors required by the integration process. End-users can instantly switch on-the-fly from one integration to another. And the Integration Builder gives you full control over the integration: add as many mappings as you like, change mapping behaviors, create your own integrations on your own, based on your own rules, and with no… programming… ever.

Agni Link allows us to cut our design and engineering costs by 20% by eliminating the need to manually copy BoM data from CAD to ERP.

Mario Nadeau

Technical Director, Law Marot Milpro

Agni Link helps us reduce our annual design and engineering costs by at least $90,000

Dean I. Haase

Software/Electrical Engineering Manager, Innovative Laser Technologies

InterClean Equipment saved 12% on design and engineering costs by moving to Agni Link! Not bad at all, I say 🙂

John Walsh

IT/Controls Manager, InterClean Equipment, Inc.

Book a Free Demo Now!

Please complete this form to book an Agni Link demonstration.

* indicates a required field

"*" indicates required fields

YYYY slash MM slash DD
Please indicate the timezone from where you will attend the demo
Name*
(Including country code and extension, if required)
Time Slot - First Choice
:
Time Slot - Second Choice
:
Time Slot - Third Choice
: